In 2016, I called for Hinkley C to be scrapped. Now its commissioning has been pushed back to the end of the decade and its costs have ballooned to as much as £48 billion in 2024 money. I was right.
The French EPR design is terrible. Every plant of this design is a mess. Should have gone with the Westinghouse AP1000 design.
Doubling down on Sizewell C was a terrible decision.
The French EPR design is terrible. Every plant of this design is a mess. Should have gone with the Westinghouse AP1000 design.
Doubling down on Sizewell C was a terrible decision.